LOW-SPEED OPEN-LOOP WIND TUNNEL FOR VRIJE UNIVERSITEIT BRUSSELS



date: 2015
with: prof. ing. Tim De Troyer, ing. Kristof Arickx

The new wind tunnel for the department of industrial engineering of the VUB, designed and built with dr. Tim de Troyer and Kristof Arickx. 

The design is a suction tunnel, constructed out of lasercut sheet metal elements.

IMG_0084f-web - Copy



Comments are closed.