LOW-SPEED OPEN-LOOP WIND TUNNEL FOR VRIJE UNIVERSITEIT BRUSSELS

date: 2015
with: prof. ing. Tim De Troyer, ing. Kristof Arickx
The new wind tunnel for the department of industrial engineering of the VUB, designed and built with dr. Tim de Troyer and Kristof Arickx.
The design is a suction tunnel, constructed out of lasercut sheet metal elements.